Liquidated Damages and Extensions of Time in Construction Contracts
Title | Liquidated Damages and Extensions of Time in Construction Contracts PDF eBook |
Author | Brian Eggleston |
Publisher | Wiley-Blackwell |
Total Pages | 306 |
Release | 1992-01-01 |
Genre | Law |
ISBN | 9780632032952 |
"Commercial pressures in recent years have placed new emphasis on the provisions for liquidated damages and extensions of time to be found in all standard forms of construction contracts." "Times for completion have shortened, levels of liquidated damages have risen, and the once familiar practice of employers waiving their right to deduct liquidated damages has disappeared." "A surge of cases in the courts reflects the increase in disputes on liquidated damages and extensions of time, and the legal rulings which have emerged show the need for all those involved in the financial management or contract administration of construction projects to be fully informed on the subject." "This book covers in detail the legal principles on liquidated damages and extensions of time and the effects and implications of recent judgments, and examines in depth the relevant clauses of the current standard forms of building and civil engineering contracts." "Particular attention is given to the pitfalls to be avoided in setting levels of liquidated damages, to the procedures which must be followed by architects, engineers and contract supervisors in granting extensions of time, and to clarifying the many misunderstandings on time and damages which abound in the construction industry."--BOOK JACKET.Title Summary field provided by Blackwell North America, Inc. All Rights Reserved
Liquidated Damages and Extensions of Time
Title | Liquidated Damages and Extensions of Time PDF eBook |
Author | Brian Eggleston |
Publisher | Wiley-Blackwell |
Total Pages | 408 |
Release | 2009-02-09 |
Genre | Technology & Engineering |
ISBN | 9781405118156 |
Liquidated damages and extensions of time are complex subjects, frequently forming the basis of contract claims made under the standard building and civil engineering contracts. Previous editions of Liquidated Damages and Extensions of Time are highly regarded as a guide for both construction industry professionals and lawyers to this complex area. The law on time and damages continues to develop with an increasing flow of judgments from the courts. Alongside this, the standard forms of contract have also developed over time to reflect prevailing approaches to contractual relationships. Against this background a third edition will be welcomed by construction professionals and lawyers alike. Retaining the overall approach of the previous editions, the author clarifies, in a highly readable but legally rigorous way, the many misunderstandings on time and damages which abound in the construction industry. The third edition takes account of a large volume of new case law since the previous edition was published over ten years ago, includes a new chapter on delay analysis and features significantly expanded chapters on penalty clauses, the effects of conditions precedent and time-bars, and the complexities of causation.
Liquidated Damages and Extensions of Time
Title | Liquidated Damages and Extensions of Time PDF eBook |
Author | Brian Eggleston |
Publisher | John Wiley & Sons |
Total Pages | 408 |
Release | 2009-01-26 |
Genre | Technology & Engineering |
ISBN | 9781444301632 |
Liquidated damages and extensions of time are complex subjects,frequently forming the basis of contract claims made under thestandard building and civil engineering contracts. Previouseditions of Liquidated Damages and Extensions of Time are highlyregarded as a guide for both construction industry professionalsand lawyers to this complex area. The law on time and damages continues to develop with an increasingflow of judgments from the courts. Alongside this, the standardforms of contract have also developed over time to reflectprevailing approaches to contractual relationships. Against thisbackground a third edition will be welcomed by constructionprofessionals and lawyers alike. Retaining the overall approach ofthe previous editions, the author clarifies, in a highly readablebut legally rigorous way, the many misunderstandings on time anddamages which abound in the construction industry. The thirdedition takes account of a large volume of new case law since theprevious edition was published over ten years ago, includes a newchapter on delay analysis and features significantly expandedchapters on penalty clauses, the effects of conditions precedentand time-bars, and the complexities of causation.
Extensions of Time
Title | Extensions of Time PDF eBook |
Author | Gillian Birkby |
Publisher | Routledge |
Total Pages | 102 |
Release | 2019-07-26 |
Genre | Architecture |
ISBN | 1000703649 |
This is a straight forward jargon-free practical guide about all aspects of extensions of time for all construction industry professionals. An extension of time is an issue which most architects and other construction professionals face sooner or later in their career. It is a complex area where the professional administering the contract must act in accordance with the contract conditions andfailure to do so will potentially land the professional and/or his client in court. Throughout the guide the information is presented in a way that is immediately accessible, useful and related to the latest JCT Contracts. Tables, graphs and a glossary are used to help the reader navigate through chapters on liquidated damages, terms under standard contracts, notification of delay, supply of information, assessment, concurrent delays and ethical issues. The authors have clarified potentially complex issues with short, relevant examples drawn from case law and have defined difficult concepts in easy-reference text boxes. This Good Practice Guide is a friendly reference tool for all architects or other professionals charged with assessing extensions of time.
Construction Delays
Title | Construction Delays PDF eBook |
Author | Roger Gibson |
Publisher | Routledge |
Total Pages | 372 |
Release | 2008-04-30 |
Genre | Law |
ISBN | 1134281722 |
This practical, user-friendly guide for construction professionals and lawyers deals with extensions of time, and includes examples for detailed submissions, helpful charts, graphics and electronic templates.
Construction Contracts
Title | Construction Contracts PDF eBook |
Author | David Chappell |
Publisher | Routledge |
Total Pages | 342 |
Release | 2010-09-13 |
Genre | Law |
ISBN | 113516844X |
Is there a difference between inspecting and supervizing? What does ‘time-barred’ mean? Is the contractor entitled to take possession of a section of the work even though it is the contractor's fault that possession is not practicable? Construction law can be a minefield. Professionals need answers which are pithy and straightforward, as well as legally rigorous. The two hundred questions in the book are real questions, picked from the thousands of telephone enquiries David Chappell has received as a Specialist Adviser to the Royal Institute of British Architects. The material is considerably updated from the first edition – weeded, extended and almost doubled in coverage. The questions range in content from extensions of time, liquidated damages and loss and/or expense to issues of warranties, bonds, novation, practical completion, defects, valuation, certificates and payment, architects’ instructions, adjudication and fees. Brief footnotes and a table of cases are included for those who wish to investigate further. This will be an invaluable reference for architects, project managers, contractors, QSs, employers and others involved in construction.
Building Contract Claims
Title | Building Contract Claims PDF eBook |
Author | David Chappell |
Publisher | John Wiley & Sons |
Total Pages | 568 |
Release | 2008-04-15 |
Genre | Technology & Engineering |
ISBN | 140514808X |
Many building contract claims are ill-founded, often because thebasic principles are misunderstood. This highly regarded bookexamines the legal basis of claims for additional payment, and whatcan and cannot be claimed under the main forms of contract. Itincludes chapters dealing with direct loss and expense, liquidateddamages, extension of time, concurrency, acceleration, time atlarge, common law and contractual claims, global claims, heads ofclaim and their substantiation. The new fourth edition has been substantially restructured andupdated. Nearly 100 additional cases have been added as well asfour new contracts : the JCT Construction Management and MajorProject contracts, the JCT Standard Form of Domestic Subcontract,and the Engineering and Construction Contract (the NEC Form). Thebook continues to use the JCT Standard Form (JCT 98) as the basisof the text, with important differences highlighted in the otherforms. Seventeen forms are dealt with and they have all beenupdated since the last edition of this book. This new edition is essential reading for architects, contractadministrators, project managers and quantity surveyors. It willalso be invaluable to contractors, contracts consultants andconstruction lawyers. David Chappell BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has 45years' experience in the construction industry, having worked as anarchitect in public and private sectors, as contracts administratorfor a building contractor, as a lecturer in construction law andcontract procedures and for the last fifteen years as aconstruction contract consultant. He is currently the Director ofDavid Chappell Consultancy Limited and frequently acts as anadjudicator. He is Senior Research Fellow and Professor inArchitectural Practice and Management Research at the Queen'sUniversity, Belfast. He was appointed Visiting Professor inPractice Management and Law at the University of Central England inBirmingham from 1 March 2003. David Chappell is the author of manyarticles and books for the construction industry. He is one of theRIBA Specialist Advisors and lectures widely. Vincent Powell-Smith LLM, DLitt, FCIArb was a practising arbitratorand formerly Professor of Law at the University of Malaya and theInternational Islamic University, Malaysia. He was author of manybooks on construction law. John Sims FRICS, FCIArb, MAE, FRSA is a chartered quantity surveyornow practising as a consultant, arbitrator, adjudicator andmediator in construction disputes. He is author of a number ofbooks on building contracts and arbitration. Also of interest Building Contract Dictionary Third Edition David Chappell, Derek Marshall, Vincent Powell-Smith & SimonCavender 0 632 03964 7 The JCT Minor Works Form of Contract Third Edition David Chappell 1 4051 1523 8 Parris's Standard Form of Building Contract Third Edition David Chappell 0 632 02195 0 The JCT Major Project Form Neil F. Jones 1 4051 1297 2 Evaluating Contract Claims R. Peter Davison 1 4051 0636 0 Construction Adjudication Second Edition John L. Riches & Christopher Dancaster 1 4051 0635 2 The Arbitration Act 1996 A Commentary Third Edition Bruce Harris, Rowan Planterose & Jonathan Tecks 1 4051 1100 3 In preparation The NEC and JCT Contracts Compared Deborah Brown 1 4051 1823 7 Cover design by Workhaus